In short
- Voltaic Construction LLC connected 50 home solar systems in Southern California in 2025, down 69% from 2024.
- 92% of its 2025 systems came with a battery.
- 44% were leased or on a power purchase agreement.
- Contractor license #1096383: active (CSLB).
Voltaic Construction LLC installs by year
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2026 (through Aug 31) | 34 | 30 | 88% | 0 | 3% |
| 2025 | 50 | 46 | 92% | 2 | 44% |
| 2024 | 159 | 122 | 77% | 1 | 55% |
| 2023 | 162 | 26 | 16% | 0 | 9% |
Where Voltaic Construction LLC installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Los Angeles County | 158 |
| Orange County | 89 |
| San Bernardino County | 72 |
| Riverside County | 61 |
| San Diego County | 13 |
| Ventura County | 12 |
Cities and communities
- Long Beach (26)
- Victorville (20)
- Norwalk (14)
- Downey (13)
- Bellflower (11)
- Murrieta (10)
- Irvine (9)
- Lakewood (9)
- Newport Beach (9)
- Camarillo (9)
- Redlands (9)
- Garden Grove (8)
- Los Alamitos (8)
- San Bernardino (8)
- Riverside (8)
- Highland (8)
- Costa Mesa (7)
- Moreno Valley (7)
- Huntington Beach (6)
- Hesperia (6)
- Hawthorne (6)
- Westminster (5)
- Los Angeles (5)
- San Diego (5)
System sizes and prices
Voltaic Construction LLC's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $5.70/W | $4.50/W – $6.70/W | 32 |
| Total price, solar + battery | $53,600 | $36,900 – $82,300 | 65 |
| Solar size | 6.4 kW | 5.2 kW – 8.4 kW | 371 |
| Battery size | 10.5 kWh | 10.5 kWh – 13.5 kWh | 194 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Voltaic Construction LLC installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Canadian Solar | 39% |
| Vietnam Sunergy | 21% |
| LONGi | 15% |
| Aptos | 9% |
| Enphase | 3% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 63% |
| Tesla | 16% |
| SolarEdge | 15% |
| SunPower | 3% |
| SMA | 1% |
Contractor license
| Business name | VOLTAIC CONSTRUCTION LLC |
| Status | Active |
| Classifications | B| C10 |
| Issued | 09/09/2022 |
| Expires | 09/30/2028 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: Voltaic Construction.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.