In short

Busiest installers in Moreno Valley

InstallerSystems (2023–2025)With a batteryLeased or PPAMedian $/WCSLB license
Sunrun84577%89%$3.50/W#750184 active
Bright Ops36555%91%$4.70/W#1020761 listed as: susp - no qualifier
Freedom Forever LLC16235%65%$5.00/W#1029644 check status
ESP Contracting12530%45%$4.40/W#619149 listed as: contr bond susp
Better Earth Electric Inc8446%40%$5.80/W#1024460 active
Exo Energy Inc7710%99%—#1063308 active
Tesla Energy Operations Inc6980%0%—#888104 active
Rayker Inc662%0%$5.10/W#1018241 check status
Sunpower Corporation Systems6237%55%$4.60/W#890895 check status
American Solar Advantage Inc580%24%$5.20/W#1009565 check status
Current Home Solar5848%98%—#1045016 active
Powur Home Construction5326%0%$4.50/W#1060243 active
Empower Home Services5238%0%$5.60/W#1057693 active
Solcius LLC486%0%$5.20/W#976336 check status
Grid Alternatives445%100%—#867533 active
Sunfire Construction Inc4127%0%—#1073195 active
Solarmax Renewable Energy Provider Inc3933%0%$3.90/W#972048 active
Freedom Forever3897%89%—#1124448 check status
Levion Construction LLC3633%0%$6.70/W#1096696 check status
Sunpower3656%50%—#961988 active
Skyline Smart Energy3426%29%$5.50/W#1028741 active
V3 Electric Inc3367%61%—#1000573 active
Solgen Construction LLC333%0%$5.30/W#1053344 check status
Titan Solar Power CA Inc310%0%$5.50/W#1062072 check status
ADT Solar LLC2730%0%—#1080382 check status

Median price per watt: solar-only systems owners bought, shown when at least 20 are priced. License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.

How to use this list

About this data