In short

Busiest installers in Simi Valley

InstallerSystems (2023–2025)With a batteryLeased or PPAMedian $/WCSLB license
Sunrun58377%88%$4.50/W#750184 active
Freedom Forever LLC24526%46%$4.80/W#1029644 check status
Tesla Energy Operations Inc19884%0%$2.60/W#888104 active
Sunpower Corporation Systems11622%19%$4.20/W#890895 check status
ESP Contracting9282%71%—#619149 listed as: contr bond susp
Kota Construction LLC8621%0%$5.20/W#1063901 check status
A P Electrical5192%31%—#974115 listed as: judgement susp
Orange County Contracting Services4696%89%—#1023627 active
Plug It In Solar4491%0%—#986882 active
Solar Optimum Design & Electrical4360%0%—#972228 active
V3 Electric Inc3797%95%—#1000573 active
Powur Home Construction3424%0%$3.60/W#1060243 active
Better Earth Electric Inc3126%23%$5.20/W#1024460 active
Shelter Roofing & Solar Construction3158%0%—#624196 active
Semper Solaris3060%10%—#978152 active
August Roofing Incorporated2952%3%—#786740 active
Quantum Solar Designs Inc2948%0%—#956241 check status
Green Convergence2646%4%—#927678 active
Bright Ops2552%92%—#1020761 listed as: susp - no qualifier
Freedom Forever Southern California LLC25100%68%—#1124448 check status
Sunnova Energy Corporation248%92%—#1003498 check status
Demand Construction2396%74%—#1071038 check status
Lift Energy Construction Inc200%5%—#1030273 check status
Ameco Solar LLC19———#1053172 active
N R G Clean Power Inc17———#1026168 active

Median price per watt: solar-only systems owners bought, shown when at least 20 are priced. License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.

How to use this list

About this data