In short
- Myers Electric Company Inc connected no home solar systems in Southern California in 2025 or since; its latest was in 2024. If it installed yours, see what to do when an installer stops.
- Contractor license #972274: active (CSLB).
Myers Electric Company Inc installs by year
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2024 | 36 | 6 | 17% | 1 | 0% |
| 2023 | 87 | 5 | 6% | 1 | 0% |
| 2022 | 85 | 3 | 4% | 0 | 33% |
| 2021 | 134 | 8 | 6% | 0 | 0% |
| 2020 | 61 | 1 | 2% | 0 | 3% |
| 2019 | 3 | 0 | — | 0 | — |
| 2018 | 7 | 0 | — | 0 | — |
| 2017 | 16 | 0 | — | 0 | — |
Where Myers Electric Company Inc installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Los Angeles County | 41 |
| San Bernardino County | 32 |
| Riverside County | 17 |
| Orange County | 12 |
| San Diego County | 12 |
| Ventura County | 9 |
Cities and communities
- Palmdale (7)
- Ontario (4)
- West Covina (4)
- Santa Clarita (4)
- Fontana (4)
- Rialto (3)
- Rancho Cucamonga (3)
- Corona (3)
- Simi Valley (3)
- San Bernardino (3)
- Murrieta (3)
- Altadena (3)
- Temecula (2)
- Irvine (2)
- Ventura (2)
- Costa Mesa (2)
- Yucca Valley (2)
- Loma Linda (2)
- Mentone (2)
- Chula Vista (2)
- San Diego (2)
- Nuevo (1)
- Walnut (1)
- Camarillo (1)
System sizes and prices
Myers Electric Company Inc's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $3.40/W | $3.10/W – $5.10/W | 30 |
| Total price, solar + battery | too few to say | 6 | |
| Solar size | 6.7 kW | 5.2 kW – 8.4 kW | 123 |
| Battery size | too few to say | 11 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Myers Electric Company Inc installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| United Renewable Energy | 37% |
| Canadian Solar | 32% |
| Qcells | 22% |
| UnitedRenewableEnergyCo.,Ltd. | 2% |
| REC | 2% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 53% |
| SolarEdge | 37% |
| SunPower | 2% |
| Tesla | 2% |
| ABB | 2% |
Contractor license
| Business name | MYERS ELECTRIC COMPANY INC |
| Status | Active |
| Classifications | C10 |
| Issued | 04/20/2012 |
| Expires | 08/31/2027 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: Myers Electric, Mona Lee Inc.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.